
In recent years, electricity tariffs have increased dramatically across India. To encourage green energy adoption, the central government launched the PM Solar Scheme 2026 (officially known as PM Surya Ghar: Muft Bijli Yojana).
This scheme provides direct financial subsidies up to ₹78,000 for residential rooftop solar installations, giving homeowners up to 300 units of free electricity every month.
- Subsidy Slab: ₹30,000 for 1kW, ₹60,000 for 2kW, and up to ₹78,000 for 3kW to 10kW residential rooftop systems.
- Free Electricity: Generates up to 300 units of free power monthly for 1 crore households across India.
- Direct Benefit Transfer: Central subsidy is credited directly to your bank account within 30 days of net meter commissioning.
- Vendor Requirement: Installation must be executed by an MNRE-registered solar EPC vendor using ALMM-approved panels.
What is PM Solar Scheme 2026 (PM Surya Ghar Yojana)?
Approved with a budget outlay of ₹75,021 crore, PM Surya Ghar Muft Bijli Yojana makes rooftop solar affordable for residential families. Homeowners reduce grid power reliance and export daytime surplus power to DISCOM grids via net metering.
PM Solar Scheme Subsidy Structure 2026
| System Capacity | Central Subsidy Amount | Estimated Post-Subsidy Cost |
|---|---|---|
| 1 kW System | ₹30,000 | ₹30,000 – ₹40,000 |
| 2 kW System | ₹60,000 | ₹60,000 – ₹75,000 |
| 3 kW System | ₹78,000 (Fixed Cap) | ₹1,02,000 – ₹1,32,000 |
| 4 kW – 10 kW Systems | ₹78,000 (Maximum Cap) | Varies by capacity (Check Price Guide) |
PM Solar Scheme Eligibility Criteria
Applicant must be a citizen of India residing in the residential property.
Property must be owned by the applicant with an unshaded rooftop.
Must possess a valid electricity connection with local DISCOM.
Panels must be DCR ALMM-listed and installed by an MNRE vendor.
Required Documents Checklist
How to Apply for PM Solar Scheme Online (9 Steps)
Portal Registration
Register on pmsuryaghar.gov.in with State & DISCOM details.
Consumer ID
Enter consumer account number from electricity bill.
Feasibility Approval
DISCOM inspects grid feasibility within 7-15 days.
Vendor Selection
Choose registered vendor like Brightleaf Energy.
Roof Site Audit
3D shading analysis and system layout design.
System Installation
Mount ALMM panels, inverter & safety earthing grid.
Net Metering
DISCOM installs bi-directional net meter.
Submit Subsidy Claim
Upload commissioning report & bank details.
DBT Credit
Subsidy credited to bank account within 30 days.
Common Mistakes to Avoid
| Application Error | Risk Impact | Prevention Rule |
|---|---|---|
| Non-Empanelled Vendor | 100% Subsidy Disqualification | Only hire registered MNRE vendors. |
| Non-ALMM Solar Panels | Physical inspection rejection | Demand ALMM DCR certificates. |
| Name Mismatch in Bank Account | DBT transfer failure | Ensure bank name matches Aadhaar & bill. |
Why Choose Brightleaf Energy for PM Surya Ghar Scheme?
Brightleaf Energy provides turnkey solar EPC services with complete subsidy management across Delhi NCR.
100% assistance with portal registration, feasibility, and DBT claim approval.
High-efficiency modules delivering maximum daily electricity output.
Full liaisoning with local DISCOMs for quick net meter installation.
Linear power warranty and 5-year free maintenance support.
Frequently Asked Questions (FAQs)
What is the PM Solar Scheme 2026?
PM Solar Scheme 2026 (PM Surya Ghar Muft Bijli Yojana) is an Indian central government program offering financial subsidies up to ₹78,000 for residential rooftop solar systems.
How much subsidy can I get for a 3kW solar system?
A 3kW residential rooftop solar system qualifies for the maximum fixed government subsidy of ₹78,000 under the PM Surya Ghar scheme.
How is the solar subsidy credited?
The subsidy amount is credited directly to the beneficiary's bank account via Direct Benefit Transfer (DBT) within 30 days of net meter commissioning.
Can commercial properties claim PM Surya Ghar subsidy?
No, direct central subsidies are restricted to residential homes. Commercial and industrial properties can claim 40% Accelerated Depreciation tax benefits.