Gurugram Home Solar • PM Surya Ghar Subsidy Up To ₹78,000

Rooftop Solar Panel Installation in Gurugram for Homes & Villas

Cut residential electricity bills and retire expensive society diesel generator backup across DLF, Sushant Lok and Golf Course Road. We handle PM Surya Ghar subsidy up to ₹78,000 and full DHBVN net metering paperwork end to end.

PM Surya Ghar subsidy up to ₹78,000 — Haryana adds no separate state top-up
End-to-end DHBVN portal filing, feasibility sanction and bi-directional net metering
Rooftop solar panel installation in Gurugram for residential homes
25 Years
Performance Warranty

Check Your Solar Savings

Use our instant load tool below

Book Free Roof Survey

Free engineering site analysis

Talk on WhatsApp

Immediate assistance

OUR LOCAL REACH

Areas We Serve Across Gurugram

Fast, local engineering setups across all prime commercial and residential sectors.

DLF Phase 1-5Sushant LokSector 56Sector 45Sohna RoadGolf Course RoadPalam ViharNirvana CountrySector 82Sector 102South City

solar panel installation in Delhi, solar panel installation in Noida, solar solutions in Ghaziabad and 3kW, 5kW and 10kW solar system cost guide.

    Solar Panel Installation
    System Maintenance
    Solar Financing
    Residential Solar Solutions
    Commercial Solar Installation
    PM Surya Ghar Subsidy Assistance
Residential rooftop solar plant custom-designed for homes in Gurugram
CUSTOM DESIGNS

Residential Solar Solutions Tailored for Gurugram Homes

Every residential property has unique shade conditions, power load requirements, and roof properties. We don’t apply a one-size-fits-all model. Our technicians execute structural assessments, customized wind-load mountings, and optimal cable placement to deliver peak generation.

3D Shadow Analysis
Hot-dip Galvanized Structures
MARKET TRENDS

Why More Homeowners In Gurugram Are Adopting Solar Energy

Rising Grid Tariffs

Local grid electricity rates increase by 5-8% annually, whereas solar locks down generation costs.

Surya Ghar Subsidy

Direct central financial support pays for up to 30-40% of the upfront project budget.

Great Payback Period

Most systems break even in 3 to 4 years, enjoying over 21 years of completely cost-free electricity.

Net Metering Credits

Export surplus summer generation to the local distribution grid and claim unit deductions on winter bills.

RESIDENTIAL SERVICES

Our Solar Installation Services in Gurugram

Rooftop Feasibility Analysis
Custom Wind-Load Mountings
Discom Net Metering liaison
Surya Ghar Subsidy Processing
String Output Performance Audits
Tier-1 Solar Panels Supply
Certified Inverter Connections
DCDB & ACDB Safety Wiring
AMC Maintenance packages
Solar Panel Water Cleaning
Performance Dashboard Setup
Earthing & Lightning Protection
PRICING

Solar Panel Installation Cost in Gurugram, October 2026

Gross installed price before subsidy, the subsidy you can claim, and what you actually pay. Generation figures are approximate for Gurugram conditions.

Indicative rooftop solar panel installation cost and subsidy breakdown for residential systems in Gurugram
SystemGross CostPM Surya GharYou Pay (from)Generation
1 kW₹67,000− ₹30,000₹37,000120 / month
2 kW₹1,34,000− ₹60,000₹74,000240 / month
3 kW₹2,01,000− ₹78,000₹1,23,000360 / month
5 kW₹3,35,000− ₹78,000₹2,57,000600 / month
10 kW₹5,50,000− ₹78,000₹4,72,0001,200 / month

Indicative installed prices for Gurugram, inclusive of GST, Tier-1 TOPCon modules, string inverter, mounting structure, ACDB/DCDB wiring and DHBVN net-metering paperwork. Haryana adds no state subsidy on top of the central scheme, so the figures below reflect the central payment only. Final price is confirmed after a free roof survey.

Official sources: PM Surya Ghar Muft Bijli Yojana (national portal) · Haryana bijli vitran nigam net metering (DHBVN)

ELIGIBILITY

PM Surya Ghar Subsidy Bands for Gurugram

Haryana runs no state rooftop solar subsidy. The entire incentive available to a Gurugram homeowner is the central PM Surya Ghar payment, which is calculated on system capacity rather than on your bill.

PM Surya Ghar central subsidy bands by average monthly electricity consumption
Monthly ConsumptionSystem SizeCentral Subsidy
0 – 150 units / month1 – 2 kW₹30,000 – ₹60,000
150 – 300 units / month2 – 3 kW₹60,000 – ₹78,000
Above 300 units / monthAbove 3 kW₹78,000 (capped)

What applies in Gurugram

Haryana state subsidy
None. Gurugram homeowners receive no state top-up on PM Surya Ghar
Maximum available in Gurugram
₹78,000, from the central scheme alone
How this differs from Delhi
Delhi adds a state capital subsidy on top, so a 3 kW system there can reach ₹1,56,000 combined
What compensates for it
Lower DHBVN upper-slab tariffs and no state paperwork to track
GRID CONNECTION

DHBVN Net Metering Timeline in Gurugram

Gurugram falls under a single Haryana utility, so the approval path runs as one sequence. Brightleaf manages every step from portal filing to meter commissioning.

1

Portal registration

We file the net metering application on the DHBVN portal on your behalf.

2

Feasibility check

A DHBVN engineer visits to confirm roof suitability and sanctioned load, typically within 7–10 days.

3

Installation

Mounting and commissioning on site takes 2–4 days for a typical residential system.

4

Net meter commissioning

Bi-directional meter installation and synchronisation, around 10–15 days.

5

Subsidy disbursal

PM Surya Ghar credit reaches your registered bank account, typically within 30 days of commissioning.

6

Total elapsed time

Around 30–40 working days from application to a commissioned net meter.

Running a business instead of a home?

Factories, offices, hotels and warehouses follow a different approval path and can claim accelerated depreciation. See our commercial solar installation in gurugram for high-capacity EPC, PPA/OPEX models and industrial net metering.

Commercial solar installation in Gurugram

What we specify on every residential installation

Tier-1 modules

TOPCon and mono PERC from MNRE-listed manufacturers

25-year warranty

Performance warranty on every residential module we supply

BIS-certified inverters

String and hybrid inverters with monitoring dashboards

DHBVN paperwork handled

We file the net metering application and track sanction to meter

MONTHLY SAVINGS ESTIMATOR

Estimate Your Monthly Solar Savings

Slide the bar to match your typical home electricity bill value.

Avg Monthly Bill₹4,500
Required System
3.8 kW
Solar Cost (Net)
₹150,000
Annual Savings
₹46,512
Payback Period
~3.2 Yrs
SUCCESS PORTFOLIO

Recent Residential Solar Projects Across NCR

10kW hybrid solar installation with battery backup at a residence in Indirapuram
10kW Hybrid Setup

Indirapuram Residence

Equipped with hybrid batteries providing full power back up during grid cuts.

25kW solar plant powering common area lighting and lifts at Vaishali Housing Society
25kW Common Load Setup

Vaishali Housing Society

Powering common compound lighting, lifts, water motors, and security gates.

15kW on-grid solar system with string inverter layout at a villa in Raj Nagar Extension
15kW On-Grid Setup

Raj Nagar Extension Villa

Net-metering aligned string inverter layout ensuring maximum feed-in tariffs.

INSTALLATION WORKFLOW

How Our Solar Installation Process Works

01

Calculate Requirements

Estimate your solar energy needs.

02

Schedule Expert Visit

Pick a convenient time for site analysis.

03

Home Inspection & Planning

Experts evaluate your roof & layout options.

04

Proposal Shared

Receive a detailed custom solar proposal.

05

Apply

We assist with applications and paperwork.

06

Installation

Certified experts handle the full setup.

07

Grid Connection

Seamless connection to your local grid.

08

Enjoy the Benefits

Save money & live green with zero stress.

FAQ ARCHIVE

Frequently Asked Questions

Common inquiries regarding building load analysis, Discom subsidies, and structural configurations.

How does DHBVN net metering work for residential homes in Gurugram?
DHBVN — Dakshin Haryana Bijli Vitran Nigam — permits grid-connected rooftop solar up to 100% of your sanctioned load. We file the application on the DHBVN portal, an engineer carries out a feasibility check, and once the plant is commissioned a bi-directional meter is installed. Units your panels export during peak sun hours are credited against your night-time grid consumption, so self-consumption is always settled first.
What subsidy is available for home solar in Gurugram?
Gurugram falls in Haryana, which operates no state-level rooftop solar subsidy. The entire incentive is the central PM Surya Ghar payment: ₹30,000 per kW up to 2 kW, ₹18,000 per kW up to 3 kW, capped at ₹78,000. That cap applies regardless of system size, so a 5 kW or 10 kW system still receives ₹78,000. This is worth knowing when comparing Gurugram quotes against Delhi, where a separate state capital subsidy can take a 3 kW system to ₹1,56,000 combined.
What is the cost of a 5kW solar system in Gurugram after subsidy?
A 5 kW system costs approximately ₹3,35,000 installed before subsidy. After the ₹78,000 PM Surya Ghar payment, the net cost is around ₹2,57,000. It generates roughly 600 units a month, which against DHBVN upper-slab tariffs of about ₹7.5 per unit typically saves ₹3,000 to ₹6,000 monthly and recovers the outlay in roughly 3.5 to 4.5 years.
Can solar replace a society diesel generator backup bill?
Yes, largely. Society DG backup in Gurugram typically runs at ₹25 to ₹35 per unit, several times the grid tariff. A hybrid system with lithium battery storage runs essential daytime and night loads directly on solar, removing most of that per-unit charge from the monthly bill. For whole-society common-area loads, a larger array without storage is usually sufficient.
How long does DHBVN take to approve and install the bi-directional meter?
Around 30 to 40 working days from application to a commissioned net meter, which is the fastest approval timeline in the NCR. Within that: a DHBVN feasibility visit typically lands within 7 to 10 days, physical installation and commissioning takes 2 to 4 days, and bi-directional meter installation and synchronisation takes a further 10 to 15 days.
What mounting structure suits an elevated terrace or villa in Gurugram?
For terraces where you want to keep the rooftop usable, we design hot-dip galvanised elevated pergola structures that raise the panels 8 to 10 feet above the terrace. On RCC slabs we use standard ballasted mounting with wind-load engineering sized for Haryana's wind profile. A pre-installation shadow analysis comes first, because DLF and Golf Course Road properties are often partially shaded by neighbouring towers.

We are always ready to help you and answer your questions

Submit your operational details below and one of our solar engineering experts will contact you within 2 hours.

Call NowWhatsApp